Execution in the El Merino industrial estate of Phase 1 U.A.2: main road, with a length of 1,153 ml, and adjacent streets with a total surface area of 85,843 m2.
Asphalted surface: 32,636 m2 (12,795 tn). Paving of 13,972 m2 with concrete paving stones and execution of 4,953 m2 of cycle paths.
Execution of the separate sewage and rainwater system, supply, telephony, signposting, electrical installation and actions against climate change.