Motorway Type: AV-120
Length: 7,650 m
Structures forming the project: 2 longitudinal viaducts, 2 overpasses, 3 underpasses and 5 structures that form part of the Alcantarilla connection.
Main volumes of the project:
1,914,313 m3 EXCAVATION AT CLEARING SITE
4,393,173 kg. STEEL IN CORRUGATED BARS.
70,616 Tn BITUMINOUS MIXTURE, TYPE: AC32 BASE G.
35,695 Tn BITUMINOUS MIXTURE, TYPE: BBTM 11B (M-10) ON WEARING COURSE.
3,672 m. REINFORCED CONCRETE PILE 150 CM DIAMETER.
7,015 m REINFORCED CONCRETE PILE, 65 CM IN DIAMETER.